DJ Basin complex — natural gas & ngl project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Colorado gathering, treating and processing complex comprising the Platte Valley, Fort Lupton, Wattenberg, Lancaster and Latham processing plants and the Wattenberg gathering system, with 17 processing and treating plants, two gathering systems and 1,677 pipeline miles. Supply comes primarily from the Wattenberg field. Residue takeaway runs through the CIG pipeline, Tallgrass Energy's Cheyenne Connector and Xcel Energy's residue pipelines; NGLs takeaway through Overland Pass, FRP and DCP's Wattenberg NGL pipeline, with fractionators and a truck-loading facility at the Platte Valley and Wattenberg plants providing access to local NGLs markets. Occidental provided 56% of 2025 throughput and the two largest third-party customers 30%.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.