DJ Basin — oil & natural gas project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
DJ Basin throughput grain covering the DJ Basin gathering, treating and processing complex and the DJ Basin crude-oil gathering, stabilization and storage system in Colorado, both supplied primarily by the Wattenberg field. Natural-gas throughput rose 2% in 2025 and crude-oil and NGLs throughput rose 5% on increased area production. Occidental accounted for 56% of DJ Basin complex throughput and 98% of DJ Basin oil system throughput in 2025. Excluding equity investments, the DJ Basin assets provided 29% of total revenues and other, 30% of natural-gas throughput and 23% of crude-oil and NGLs throughput.
Processing facilities
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.