Plaquemines Project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Two-phase LNG export facility under construction and commissioning. As of December 31, 2025 all 36 mid-scale liquefaction trains (24 in Phase 1, 12 in Phase 2) were operating and capable of producing LNG while still undergoing testing; commissioning cargos have been exported since January 2025. Includes four 200,000-cubic-meter storage tanks, two power island systems (plus 400 MW temporary power), gas pre-treatment units and three berths, fed by the Gator Express interstate pipeline (15-mile and 12-mile lines). Targeted COD Q4 2026 (Phase 1) and mid-2027 (Phase 2).
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.