Cameron LNG — natural gas project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
LNG export facility in Louisiana, United States, in which TotalEnergies holds a 16.60% stake. The three phase-1 trains, each with a capacity of 4.5 Mt/y (13.5 Mt/y total), began production in 2019 (train 1) and 2020 (trains 2 and 3). A study to expand the plant beyond its initial 13.5 Mt/y capacity (Train 4) is ongoing, with an agreement signed with Sempra Infrastructure, Mitsui and Mitsubishi.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.