Valhalla North and Berland River Project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
NGTL System expansion sanctioned November 2022 and approved by the CER in December 2023, designed to provide ~428 TJ/d (400 MMcf/d) of incremental capacity. The Valhalla section (33 km of new pipeline, ~$0.2 billion) was placed in service in Q3 2025; the Berland River section, including a non-emitting electric compressor unit, targets in-service in the second half of 2026 with an estimated cost of $0.3 billion.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.