Blackcomb Pipeline (Joint Venture) — natural gas project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Joint-venture natural gas pipeline (Targa 17.5%, WPC 70.0%, MPLX 12.5%) designed to transport up to 2.5 Bcf/d through approximately 365 miles of 42-inch pipeline from the Permian Basin to the Agua Dulce area; expected in service in the fourth quarter of 2026.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.