Tourmaline Brazeau Gas Plant — natural gas & ngl project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Deep Basin gas plant commissioned by Tourmaline in 2016 with 70 MMcf/d of raw gas and 2,200 Bbls/d of liquids handling capacity. The complex consists of one processing train and associated equipment on the 15-36-044-15W5 site plus a compressor station on the 16-36-044-15W5 site that can offload excess gas volumes to the Keyera Brazeau East facility, and the lease can accommodate a second processing train if required. It processes Tourmaline's Alberta Deep Basin production from Columbia, Brazeau, Peco and Stolberg through Tourmaline-owned pipelines, plus third-party volumes on which Topaz earns processing revenue in proportion to its ownership interest.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.