Topaz Infrastructure Portfolio — natural gas project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Energy infrastructure segment holding non-operated ownership interests in nine natural gas processing and gathering facilities in the Western Canadian Sedimentary Basin with cumulative net natural gas processing capacity of approximately 268 MMcf/d, together with associated crude oil and condensate handling facilities and two water management facilities. Interests are held alongside Tourmaline, Advantage, Tamarack, Whitecap, Logan and Headwater and the majority of the revenue is contracted under long-term fixed-fee take-or-pay agreements. Topaz bears its proportionate share of operating and capital costs, environmental liabilities and reclamation obligations except at the Glacier Gas Plant, Pipestone Assets, Gundy Gas Plant, Wembley Facility, Musreau Facility, Clearwater Gathering System and Pouce Coupe Facility, where the operator or producer has agreed to carry operating and maintenance capital during the volume commitment term. A separate contracted interest in third-party revenue at Tourmaline-owned facilities generates Other Income with no underlying asset ownership.
Portfolio Aggregate · Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.