Description
As at 31 December 2025
Natural gas gathering system in the Marten Hills area of the Clearwater play with natural gas capacity of approximately 8 MMcf/d. The system was contracted in October 2023 as part of a $26.3 million package of definitive agreements with Headwater that also created a new gross overriding royalty interest in the Clearwater operating area, with funding for the gathering system advanced on final commissioning. Topaz closed the acquisition of its 99% interest on December 17, 2024. The system captures solution gas from Headwater's Clearwater heavy oil development, an area where Topaz also holds a substantial royalty position.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.