Phoenix Field — project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
Description
Deepwater field produced through the Helix Producer I (HP-I) dynamically positioned floating production facility. The HP-I is operated by Helix Energy Solutions Group and requires dry-docking every two to three years for U.S. Coast Guard inspection, with the next dry-dock scheduled for the first half of 2027.
Oil & Gas metrics
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.