Pilgangoora Operation โ lithium & tantalum mine
Data compiled from public filings โ information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 30 June 2025
Description
As at 30 June 2025
Tier-one hard-rock lithium (spodumene) open-pit operation in the Pilbara region of Western Australia with a ~32-year mine life, in production since 2018. Comprises the Pilgan Plant (with new ore sorting facility) and the Ngungaju Plant, the latter placed into temporary care and maintenance in December 2024 under the single-plant P850 operating model (~850ktpa capacity) with rapid-restart capability. The $560M P1000 Expansion Project completed in FY25 added ~320ktpa nameplate capacity (first ore 31 January 2025; ramp-up completed March quarter 2025). A major power station upgrade added gas generators, LNG storage and a battery energy storage system. FY25 ore mined 5.22M wmt @1.4% Li2O; lithia recovery 71.9%; tantalite produced as by-product. Royalties: 5% WA state + 1% native title + 5% private royalty on part of the Altura-acquired resource. P2000 Feasibility Study (2Mtpa) extended to FY27; Mid-Stream Demonstration Plant (Calix JV) under construction on site.
Mining metrics
Multiple effective dates ยท inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources โ detail
As at 30 June 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright ยฉ 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.