KCGM
Project information
As at 31 March 2025
Description
As at 31 March 2025
KCGM (Kalgoorlie Consolidated Gold Mines) is Northern Star's largest single asset, comprising the iconic Fimiston Super Pit + Mt Charlotte underground operations and the Fimiston Processing Plant in Kalgoorlie-Boulder, Western Australia. FY25 gold sold 418.8 koz at AISC A$2,061/oz; FY25 production was impacted by lower productivity in Golden Pike North driven by delayed access during the 4.5-year East Wall remediation, which was safely completed late FY25. FY25 R&R lifted 23%/9% YoY (+7.2 Moz MR / +1.2 Moz Reserves). KCGM Mill Expansion Project (13->27 Mtpa) entering its final FY26 build year; cut-over on track for early FY27 with two-year ramp-up to FY28. Group total +100% MR and +50% Reserves since the 2020 acquisition (from 19.1 Moz MR / 9.7 Moz Reserves at 30 Jun 2020 to 38.9 Moz MR / 14.4 Moz Reserves at 31 Mar 2025).
Mining metrics
Multiple effective dates · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 March 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.