Kanowna Belle — gold mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 March 2025
Description
As at 31 March 2025
Kanowna Belle is part of the Kalgoorlie Production Centre, primarily an underground mine plus surface satellites (Red Hill open pit, Ballarat Last Chance / BLC), feeding the Kanowna Belle processing plant. FY25 drilling efforts targeted expansion of the Joplin mining area and infill drilling to upgrade existing Mineral Resource confidence. Surface diamond and RC drilling at Red Hill returned highlight intersections of 308.5 m @ 1.3 g/t and 103.7 m @ 1.6 g/t. Total Mineral Resource increased by over half a million ounces to 5.9 Moz @ 1.7 g/t Au at 31 March 2025.
Mining metrics
Multiple effective dates · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 March 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.