Bandeira — lithium project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 20 November 2024
Description
As at 20 November 2024
Underground hard-rock lithium project located in the Araçuaí Pegmatite District of Minas Gerais, Brazil. Property is situated near the CBL lithium mine and Sigma Lithium's operations, with access to hydroelectric grid power and paved roads to the Port of Vitória. Sept-2025 Feasibility Study outlines an 18.5-year underground mine producing 177 ktpa of 5.2% Li2O spodumene concentrate, with initial capex of US$191M and after-tax NPV8 of US$1.45B at US$2,212/t SC6. Processing utilizes a modular dense media separation (DMS) plant. Application for a Concomitant Environmental License was submitted in November 2023. Flagship Brazilian lithium asset.
Mining metrics
As at 20 November 2024 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 20 November 2024
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.