Nowa Sól Project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 9 January 2026
Description
As at 9 January 2026
Flagship advanced-stage, sediment-hosted copper-silver project in the Lubuskie region of western Poland, held 100% via wholly-owned subsidiary Zielona Góra Copper Sp. z o.o., within the Kupferschiefer copper belt. Envisaged as an underground operation across two areas — the North Shaft Complex and the South Shaft Complex — using room-and-pillar mining (1.8 m minimum mining height, 6.0 m room width). An NI 43-101 PEA (effective Jan 9, 2026; report dated Apr 23, 2026; Micon International QPs) returned a base-case pre-tax NPV7 of ~US$8.33B and IRR ~20.5%; post-CIT NPV7 ~US$6.32B (IRR ~18.0%) excluding the Polish mineral extraction tax (MET), and ~US$1.60B (IRR ~10.8%, ~3.5-yr payback) including MET. The company does not expect to build without MET relief. QPs recommend a PFS supported by infill/definition drilling (3 platforms mobilized), metallurgical, geotechnical and hydrogeological work and environmental/social baselines; recommended PFS budget ~C$74.1M (incl. 15% contingency; ~C$54.8M drilling).
Mining metrics
As at 9 January 2026 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 9 January 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.