Rimbey Gas Plant — natural gas & ngl project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Full-service sour gas plant 100 km southwest of Edmonton with 422 MMcf/d licensed capacity, NGL extraction, NGL fractionation (28,000 Bbls/d), ethane extraction (20,000 Bbls/d) and sulphur recovery. Terminus of Keyera's Keylink pipeline, connected to the Edmonton/Fort Saskatchewan area via the Rimbey Pipeline and the Alberta Ethane Gathering System. 2025 average daily throughput 204 MMcf/d.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.