KAPS Pipeline System — project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
The Key Access Pipeline System, an NGL and condensate pipeline that became operational in Q2 2023, transporting Montney and Duvernay production from northwestern Alberta to Keyera's fractionation assets and condensate system in Fort Saskatchewan, fully integrating the Wapiti, Pipestone and Simonette gas plants to the downstream liquids platform. The KAPS Zone 4 expansion advanced through Front End Engineering and Design in 2025.
Processing facilities
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.