Brazeau River Gas Plant — natural gas project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Gas plant ~170 km southwest of Edmonton with 218 MMcf/d licensed capacity, able to process both sweet and sour gas; processes include inlet compression, sour gas sweetening, dehydration, NGL recovery and acid gas injection. 2025 average daily throughput 125 MMcf/d.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.