PT Vale Indonesia Portfolio โ nickel mine
Data compiled from public filings โ information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Indonesia-listed nickel producer operating under a Special Mining Business License (IUPK) covering 118,017 hectares across three Sulawesi blocks (Sorowako 70,566 ha in South Sulawesi, Bahodopi 22,699 ha in Central Sulawesi, Pomalaa 20,286 ha plus Sua-Sua 4,466 ha in Southeast Sulawesi), valid until December 28, 2035. Core business is open-pit lateritic nickel mining; products are nickel matte from the Sorowako pyrometallurgical smelter and saprolite ore sales (since 2025) from Bahodopi and Pomalaa. Reserves and Resources reported under KCMI and SK-1300 standards as at 31 December 2025 on 100% basis. RPEEE assumes US$18,500-21,000/t Ni and US$67,500/t Co; reserves prospects use US$17,775-18,500/t Ni. Growth pipeline (IGP) comprises three HPAL JV processing facilities (Pomalaa-KNI, Morowali-BNSI, Sorlim-HLNI) plus Tanamalia mine preparation. 2025: nickel matte production 72,027 t, saprolite ore 15.9 mt mined, revenue US$990.2 m, EBITDA US$228.2 m, net profit US$76.1 m.
Portfolio Aggregate
Multiple effective dates ยท exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources โ detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright ยฉ 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.