HLNI HPAL Sorlim — project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
Description
High-Pressure Acid Leaching (HPAL) facility under construction in Sorowako (East Luwu Regency, South Sulawesi) to produce mixed hydroxide precipitate (MHP) for EV batteries. JV partner PT Huali Nickel Indonesia (HLNI), in partnership with global partner Huayou (slurry pipeline component). Project commenced June 2024; construction at 17% by end-2025; first production targeted 2027. Progress on autoclave fabrication, land acquisition for the 45.3 ha FPP facility, completion of HLNI Material Storage Yard at Waru Waru and Enggano Ports, and slurry pipeline route evaluation in mining areas. Mining feed sourced from Sorowako Block limonite (IGP Sorlim).
Processing facilities
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.