Cold Lake
Project information
As at 31 December 2025
Description
As at 31 December 2025
100% WI in-situ heavy oil bitumen operation - product is a blend of bitumen and diluent. Leming SAGD project achieved first oil in November 2025, re-developing the original pilot area. ~161,000 net acres of oil sands leases. 2025 net production 122 mbbls/d (151 gross). 4 net development wells drilled in 2025 plus 9 wells drilling at year-end.
Oil & Gas metrics
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Oil & Gas inventory & footprint
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.