Wimmera — project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Fine-grained heavy mineral sands project in the Wimmera region of western Victoria (Murray Basin), including the WIM100 deposit, for potential long-term supply of rare earths and zircon and as future feedstock for the Eneabba refinery. In definitive feasibility study (DFS) stage with an Environment Effects Statement (EES) to be submitted to the Victorian Government in 2026. Detailed engineering began in 2025 under an Integrated Owner's Team model with WSP; flowsheet testing produced finished zircon products (~40% of extracted zircon sand suitable for ceramics, markets identified for ~60%). A resource increase was announced in January 2026. Reserves and resources reported at the Murray Basin level.
Mining metrics
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.