Mentor Storage Terminal — ngl project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Propane storage and rail/truck loading-and-unloading facility in Mentor, Minnesota with aggregate working storage capacity of approximately 330 MBbls (a 325 MBbls underground cavern plus three above-ground bullet tanks of ~5 MBbls). Includes a dehydration facility, 11 rail unloading racks and two truck loading racks; the cavern and truck racks each have ~6 MBbl/d propane injection/withdrawal capacity.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.