Crude Oil Gathering — project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Crude oil gathering system of approximately 615 miles of pipelines connecting Chevron- and third-party-operated wells to the Ramberg Terminal Facility, the Tioga Rail Terminal and Johnson's Corner Header System, with current capacity up to approximately 290 MBbl/d. Includes the Hawkeye Oil pumping and truck-unloading facility (75 MBbl/d receipt, ~10 MBbls storage). 2025 crude gathering throughput averaged 121 MBbl/d and crude terminaling 129 MBbl/d.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.