Cameron Highway Oil Pipeline System (CHOPS) — project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
One of the largest crude oil pipelines in the Gulf of America (by length and design capacity), 64% owned. The 2025 CHOPS expansion overhauled the Garden Banks 72 platform topside facilities, reconnected the pipeline to GB-72 and added pumps at the High Island A5 and GB-72 platforms to increase throughput, supporting Shenandoah volumes routed via the SYNC Pipeline.
Processing facilities
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.