Springpole — gold & silver project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 13 November 2025
Description
As at 13 November 2025
Large undeveloped open-pit gold-silver project in northwestern Ontario, hosted in the Birch-Uchi greenstone belt (~110 km NE of Red Lake) across a consolidated 70,000+ hectare land package. A 2025 feasibility study defines a 30,000 t/d open-pit mine and whole-ore cyanidation-CIL plant producing gold dore with a silver by-product over a 9.4-year mine life, with average metallurgical recoveries of 86% Au and 86.2% Ag. The lake-hosted deposit requires controlled dewatering and a co-disposal facility for tailings and waste rock. Economics incorporate 1-2% NSR royalties and a silver stream on 25% of payable silver following buybacks. A Long Term Relationship Agreement with Mishkeegogamang First Nation was concluded in July 2025 and the project is advancing through federal and provincial environmental assessment.
Mining metrics
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.