White River Hub
Project information
As at 31 December 2025
Type:
Processing Facility
Type:
Processing Facility
Aggregation level:
Asset
Aggregation level:
Asset
Status:
Operating
Status:
Operating
Report standard:
-
Report standard:
-
Ownership %:
50
Ownership %:
50
Operator:
No
Operator:
No
Extraction:
Processing Facility
Extraction:
Processing Facility
Country:
United States
Country:
United States
Region:
Colorado
Region:
Colorado
Facility kind:
Pipeline Gas
Facility kind:
Pipeline Gas
Licensed capacity:
1500
Licensed capacity:
1500
Capacity unit:
mmcf
Capacity unit:
mmcf
Capacity period:
Per Day
Capacity period:
Per Day
Capacity kind:
Nameplate
Capacity kind:
Nameplate
Description
As at 31 December 2025
50% equity-method natural gas hub serving Piceance producers with access to six interstate pipelines; gross throughput capacity of 3 Bcf/d. FERC-regulated. Approximately 10 miles of pipeline.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.