Enterprise Hydrocarbons Terminal (EHT) — oil & ngl project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Marine terminal with eight deep-water ship docks and a barge dock accommodating Suezmax tankers (45-ft draft). LPG export loading capacity of ~835 MBPD with capability to load six VLGCs simultaneously; crude oil export assets capable of loading up to 2.9 MMBPD; semi-refrigerated propylene loading up to 72 MBPD; refined products operations with 2.4 MMBbls of storage; crude storage of 23.9 MMBbls across 81 tanks; NGL import capability up to 5,000 bbl/hour. The Ref 4 fourth refrigeration train (+~300 MBPD LPG capacity) is expected in service by end-2026.
Processing facilities
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.