Storage and Transportation Segment — oil project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Crude oil, intermediate and refined-product storage tankage and pipeline transportation supporting the Delek Refineries (Tyler, El Dorado, Big Spring), with approximately 10.0 million barrels of active shell storage capacity. Includes the Tyler Crude Tank (~350,000 bbl), the Tyler Tank Assets (96 tanks, ~2.0 MMBbl) and the Magnolia Station (~230,000 bbl), plus the Magnolia and Paline pipelines.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.