Tulsa Refineries — oil project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Tulsa West (750-acre site) + Tulsa East (466-acre site) facilities in Tulsa, OK. Combined crude processing rate ~125,000 BPSD. Tulsa West: crude/vacuum distillation with light ends recovery, naphtha hydrodesulfurization, propane de-asphalting, lubes extraction, MEK dewaxing, delayed coker, butane splitter. Tulsa East: crude/vacuum distillation, naphtha hydrodesulfurization, FCC, isomerization, catalytic reforming, alkylation, scanfiner, diesel hydrodesulfurization, sulfur units. Tulsa West also produces specialty lubricants/base oils/waxes.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.