Leviathan
Project information
As at 31 December 2025
Description
As at 31 December 2025
39.7%-owned and operated deepwater gas field under a concession expiring in 2044. A third gathering pipeline under construction is expected to increase gas production capacity from ~1.2 to 1.4 bcf/d (completion early 2026). In early 2026, FID was reached on the Leviathan Expansion Phase 1 Project, expected to increase upstream production capacity to 2.1 bcf/d.