Leviathan — natural gas project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
39.7%-owned and operated deepwater gas field under a concession expiring in 2044. A third gathering pipeline under construction is expected to increase gas production capacity from ~1.2 to 1.4 bcf/d (completion early 2026). In early 2026, FID was reached on the Leviathan Expansion Phase 1 Project, expected to increase upstream production capacity to 2.1 bcf/d.
Oil & Gas metrics
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.