Christina Lake
Project information
As at 31 December 2025
Description
As at 31 December 2025
100% WI in-situ SAGD oil sands project in northern Alberta. Includes adjacent MEG Energy assets acquired on November 13, 2025, adding low-cost Christina Lake North production. Narrows Lake tie-back completed and fully ramped up in 2025. 2025 bitumen production 254.3 Mbbls/d (up from 234.2 in 2024).
Oil & Gas metrics
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Oil & Gas inventory & footprint
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.