Western North Slope β oil & natural gas project
Data compiled from public filings β information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Multi-unit conventional oil development comprising the Bear Tooth Unit (including the Willow Project), the Colville River Unit (Alpine Field and four satellites), and the Greater Mooses Tooth Unit (GMT1 and GMT2). Located on the North Slope of Alaska, including the National Petroleum Reserve Alaska (NPR-A). The Colville River Unit includes one central production facility. The Willow Project is in construction, with first oil anticipated in early 2029; it will include three drill sites, an operations center, and a processing facility. In 2025, one part-time drilling rig operated in the Colville River Unit.
Oil & Gas metrics
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright Β© 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.