Coimolache Sulfides
Project information
As at 31 December 2025
Description
As at 31 December 2025
Flotation plant project for the processing of copper sulfides found beneath the oxide ore in the Coimolache deposit. Pre-feasibility study planned for 2026, including a 22,000-meter copper sulfide drilling program.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.