Goose Mine + Back River District
Data compiled from public filings โ information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Goose Mine + Back River Gold District (BTO 100% via B2Gold Nunavut). Located ~520 km NE of Yellowknife. Includes Umwelt, Llama, Goose Main, Echo, Nuvuyak, Goose Neck South deposits + George Claims Group (Locale 1/2, LCP North/South, Tupiq, GH deposits). 163-km Winter Ice Road from MLA. Umwelt UG production commenced late October 2025. SAG mill optimization study being finalized H1 2026, potentially expanding throughput to 6,000 tpd.
Mining metrics
Multiple effective dates ยท inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources โ detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright ยฉ 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.