Otway Basin — project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 30 June 2025
Description
As at 30 June 2025
Beach's operated offshore gas position in the Otway Basin off Victoria and South Australia, produced via the 205 TJ/day Otway Gas Plant. FY25 production rose 64% to 6.8 MMBOE, driven by new wells connected in October 2024 (e.g. Thylacine West, Enterprise), partly offset by performance at some wells with improved performance at Thylacine Main and North. Net-to-Beach 2P reserves are 33.1 MMBOE (gas 164 PJ, LPG 313 kt, condensate 2.4 MMbbl), all developed, with 24.8 MMBOE of 2C contingent resources.
Oil & Gas metrics
As at 30 June 2025 · 2P
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.