Beach Energy Portfolio โ natural gas project
Data compiled from public filings โ information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 30 June 2025
Description
As at 30 June 2025
Consolidated upstream portfolio of Beach Energy Limited, an ASX-listed, gas-weighted Australian oil and gas producer supplying domestic energy from operations across five basins: the Cooper Basin (Western Flank oil/gas and the Santos-operated Cooper Basin JV), the Otway Basin (Victoria and South Australia), the Bass Basin, the Perth Basin (Waitsia), and the Taranaki Basin (Kupe) in New Zealand. FY25 production rose 9% to 19.7 MMBOE (sales up 16% to 24.7 MMBOE) with first Waitsia LNG cargoes during the year. Net-to-Beach reserves at 30 June 2025 were 93.4 MMBOE 1P, 172.5 MMBOE 2P (76% developed) and 253 MMBOE 3P, with 179.3 MMBOE of 2C contingent resources; 2P reserves life is 8.8 years. Beach is also progressing the Moomba carbon capture and storage project (2P CO2 storage capacity 4.1 Mt; 2C storage 89.2 Mt). The company finished FY25 with A$368 million of net debt and declared total dividends of 9 cents per share.
Portfolio Aggregate
As at 30 June 2025 ยท 2P
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources โ detail
As at 30 June 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright ยฉ 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.