Western Australia Nickel — cobalt project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 30 June 2025
Description
As at 30 June 2025
Nickel West operations (Mt Keith, Leinster mines; Kalgoorlie smelter 110 ktpa matte; Kwinana refinery 82.5 ktpa metal; Kambalda concentrator 1.6 Mtpa) and the West Musgrave project, all transitioned into temporary suspension in December 2024 amid nickel market surplus. FY2025 saleable production 30.2 kt nickel and 450 t cobalt before suspension.
Mining metrics
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.