Area C Joint Venture — iron mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 30 June 2025
Description
As at 30 June 2025
WAIO mining hub — production reported on share basis (85%); includes South Flank. Reserves and resources are reported at the WAIO Pilbara level by material type rather than per hub.
Mining metrics
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.