AMIN Smelter and PMR — gold & copper project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
State-of-the-art copper smelter and Precious Metals Refinery located near Benete Port, approximately 18 km from the Batu Hijau mine. Commissioning commenced in 2024 with first copper cathode produced in March 2025 and first refined gold in July 2025. Facility processes copper concentrate from Batu Hijau to produce LME Grade A copper cathode, refined gold, refined silver, sulfuric acid, and selenium. Powered by a dedicated 450 MW Combined Cycle Power Plant.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.