Salar de Atacama / La Negra
Project information
As at 31 December 2025
Description
As at 31 December 2025
Albemarle's flagship lithium brine operation on the Salar de Atacama, the largest salt flat in Chile, with conversion at the nearby La Negra plant (three boron-removal, three Ca/Mg-removal and three lithium carbonate plants plus a lithium chloride plant). Brine (1,500-6,000 mg/L Li) is pumped to evaporation ponds for 18-24 months, then trucked to La Negra. Operates under a CORFO contract (amended 2017) running until quota exhaustion or January 1, 2044, with commissions on sales and community commitments; the reserve plan is truncated at September 2041 per the authorized quota. An early warning plan governs pumping rates around protected systems; direct lithium extraction with re-injection and the Salar Yield Improvement plant are being studied to lift output within the quota. Site has its own powerhouse and groundwater rights.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.