Gediktepe
Project information
As at 20 August 2024
Description
As at 20 August 2024
Open-pit polymetallic mine currently producing oxide gold and silver, with a fully permitted sulphide expansion underway to produce copper and zinc concentrates. Located near Balikesir in Western Turkey. Acquired in August 2024 from Lidya Madencilik. A $146 million fixed-price EPC contract with GAP INSAAT is executing the sulphide flotation circuit, targeting first copper production in 2026. Expected to yield 20-25 kt of copper equivalent annually over an initial 11-year period.
Mining metrics
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 20 August 2024
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.